.国产短视频

国产短视频

Newsroom

water tower located on the Tampa campus

The water tower on the 国产短视频Tampa campus will be revitalized and painted as part of USF's Capital Renewal Program.

Dozens of maintenance projects to begin across campuses to help strengthen USF鈥檚 infrastructure

By Tina Meketa, University Communications and Marketing

One of USF鈥檚 most iconic structures is undergoing a much-needed renovation. The 26-year-old water tower located on the Tampa campus is getting repaired and will soon be painted with a yet-to-be-revealed design 鈥 helping extend its lifespan. It hasn鈥檛 been painted in more than a decade or received any significant construction improvements since that time. 

"The 87 projects on this list represent the greatest needs of our aged and/or failed infrastructure across the three 国产短视频campuses." 鈥 Scot Berrian, assistant director of Design and Construction, Office of Administrative Services

The 212-foot tower is responsible for pressurizing and supplying drinking water to the majority of buildings on campus. Its revitalization is one of the most publicly recognizable projects being funded by an investment of nearly $73 million in last year鈥檚 state budget to support USF鈥檚 Capital Renewal Program, which addresses a portion of the university鈥檚 deferred maintenance needs.

The Office of Administrative Services, which oversees facilities management, used an inclusive process that involved input from representatives from all three campuses to identify 87 critical projects. The projects on each campus mostly pertain to utility and plant operations, such as electrical, fire alarm and HVAC systems, as well as roof repair and replacement. 国产短视频Facilities Management recently unveiled an interactive map, allowing students, faculty and staff to view the location of each project and track its status.

Map of Tampa campus

国产短视频Tampa campus

Map of 国产短视频St. Petersburg campus

国产短视频St. Petersburg campus

Map of 国产短视频Sarasota-Manatee

国产短视频Sarasota-Manatee campus

Damaged roof

Roof of the John and Grace Allen Building

鈥淲hat the 国产短视频community isn鈥檛 always aware of, are the critical infrastructure and utility systems that support the entire campus,鈥 said Hari Patel, director of Facilities Information Services. 鈥淢ore than half of this funding is going to projects that support utility infrastructure or multiple facilities. We wanted to bring transparency and awareness to the 国产短视频community about these projects and the areas they will impact.鈥

Approximately 40 percent of the roofs on the Tampa campus are at or beyond the recommended age for replacement. The one in greatest need of attention belongs to the John and Grace Allen Building, the first building to be constructed when the university was established in 1956. While repairs have been made over the years, the roof has never been replaced and is long past its expiration.

Rusted HVAC system

Rusted HVAC system

Heat, ventilation and air conditioning needs are also being addressed with the replacement of 12 HVAC systems, with most of the work getting started early next year.

鈥淚 love the Allen Building and the beautiful courtyard. I鈥檝e worked in the building since 2010. Sometimes it鈥檚 extremely cold in the office and other times it鈥檚 uncomfortably humid. We are really looking forward to the improvements,鈥 said Risa Blake, administrative specialist in the Student Ombuds Office.

In addition to the Ombuds Office, the Allen Building is home to several other departments, including the Office of Veteran Success, Office of Graduate Studies and some Student Success offices. It also houses the Judy Genshaft Honors College, which is moving into its new building next month. 

John and Grace Allen Building

John and Grace Allen Building

鈥淥ver the nine years that I鈥檝e worked in the Allen Building, we have had several leaks from the roof into classrooms and offices,鈥 said Charles Adams, dean of the Judy Genshaft Honors College. 鈥淭he HVAC system similarly needs a complete overhaul. Sometimes it鈥檚 unbearably hot in the classrooms and offices, sometimes it鈥檚 freezing, and sometimes it鈥檚 both stifling and freezing depending on where you are in the building. We鈥檙e very grateful to the state for providing funding so that these conditions can finally be addressed.鈥

These projects are set to be completed throughout the next three years, with the revitalized water tower ready by the start of the fall semester. The Office of Administrative Services is working closely with the Office of Supplier Diversity in its efforts to promote upcoming construction work opportunities. More information on those opportunities can be found here.

Return to article listing

Category

News Archive

Learn more about USF's journey to Preeminence by viewing Newsroom articles from past years.

国产短视频in the News

December 11, 2024

December 10, 2024

December 9, 2024

December 7, 2024

More 国产短视频in the News